The ductwork decides more than the unit does
A contractor has to check whether the existing ducts can handle the airflow a new system needs before quoting a price. Ducts that are too small, leaky, or poorly laid out can mean sealing, resizing, or replacing sections before the new condenser and air handler go in. That work is often a bigger part of the job than the equipment itself.







